KS1 outdoor play area at Warwick School

The addition of bow top railings has provided the key stage 1 children at Warwick School with a safe outdoor play area.

KS1 outdoor play perimeter fencing works consisted of:


Supply and install 1.2mtr high ROSPA spec bow-top steel railings consisting of:
-
50mm x 50mm bespoke cranked posts with welded cap
-
Panels at 2.8m centres
-
16mm solid bar infill
-
Galvanised and Powder coated black RAL 9005
-
Tarmac surfacing repaired using cold lay tarmac around posts

Date
Thu, 4 Apr 2024
Project
Warwick School - KS1
Author
D Bedford
Publisher
DRB
Tags
  • Prior to fencing works

  • Warwick School Bow top fencing area for KS1

  • Warwick School keystage1 play area

  • Bowtop fencing and gates