Skip to content
Education

Dunnington CE Primary School, Alcester

Alcester

School Perimeter Fencing – Dunnington CE Primary School, Alcester

In December 2023, we installed new school perimeter fencing at Dunnington CE Primary School near Alcester in Warwickshire. The project included 422 metres of 1.8m Defender V mesh fencing, three pedestrian gates, a vehicle gate onto the field and a run of timber picket fencing around the staff car park.

The Brief

The school needed a secure, clearly defined boundary around its grounds, with controlled access points for pupils, staff and visitors on foot, and vehicle access onto the school field. The staff car park, which faces the road, also needed a neat, low boundary that suits a village school frontage.

Our Solution

Clearing the Fence Line

Before any fencing went in, we cut back the vegetation along the route of the new fence. This gave us a clean, straight line to install along and made sure the new boundary had no hidden gaps.

422m of 1.8m Defender V Mesh

We installed 422m of Defender V mesh fencing at 1.8m high around the school perimeter. The V-shaped folds in each panel add strength and rigidity, and the open mesh keeps clear sightlines across the grounds, so the school stays secure without feeling closed in.

Pedestrian and Vehicle Gates

To keep access controlled, we fitted four gates into the new fence line:

  • 3 pedestrian gates, each 1.2m wide x 1.8m high, for everyday foot access
  • 1 vehicle gate onto the field, 4m wide x 1.8m high, for grounds maintenance and deliveries

All gates match the 1.8m fence height, so the boundary stays the same height all the way round.

Timber Picket Fencing for the Staff Car Park

Along the staff car park boundary facing the road, we installed 25m of 900mm high timber picket fencing. It gives a clear, tidy edge to the car park and a traditional look that suits the street scene.

The Result

Dunnington CE Primary School now has a secure perimeter around its grounds, with dedicated gates for pedestrians and vehicles and a smart new frontage to the staff car park.

Project Summary

  • Client: Dunnington CE Primary School
  • Location: Alcester, Warwickshire
  • Completed: December 2023
  • Preparation: Vegetation cut back along the new fence line
  • Perimeter fencing: 422m of 1.8m Defender V mesh
  • Gates: 3 x pedestrian gates (1.2m W x 1.8m H); 1 x vehicle gate onto the field (4m W x 1.8m H)
  • Car park fencing: 25m of 900mm timber picket fencing
  • Service: Site preparation, supply and installation

Need Perimeter Fencing for Your School?

From full perimeter fencing and gates to car park and playground boundaries, we offer supply-only or fully managed installation for schools across Warwickshire and the UK. Call 01530 242 405 or email sales@secure-a-field.co.uk for friendly advice and a quote.

Sign up to our newsletter

Let's Secure Your Next Project

We deliver fully managed fencing installations from site survey to sign-off.

Get in touch today for friendly advice, fast delivery and solutions that last.